ERPM 3.2 — Engine Start Checks

Manual: ERPM Section: 3.2 Version: 1.7 | Status: Active | Effective: 15 Sep 2025
Owner: Chief Engineer | Review cycle: 12 months
Approvers: Technical Superintendent, DPA

Purpose

Ensure the main engine and auxiliaries are fit for service and safe to start in accordance with company procedures and Class rules.

Scope

All vessels when a main engine start is planned.

Responsibilities

  • Chief Engineer — authorizes start; verifies completion of checks.
  • Duty Engineer — performs checks; records findings; coordinates with bridge.

Prerequisites

  • Maintenance tasks closed; critical NCs cleared.
  • LO/FO systems within operational parameters; fuel changeover as applicable.

Procedure

  1. Mechanical — LO pressure, jacket water temp/levels; turning gear disengaged; drains as applicable.
  2. Controls & Interlocks — ahead/astern tested; remote control to bridge verified; shutdowns/trips cleared.
  3. Lubrication & Cooling — LO purifiers/filters ΔP acceptable; cooling pumps standby ready.
  4. Air System — starting air pressure within limits; receivers drained; no leaks.
  5. Alarms — critical alarms acknowledged and functional (shutdowns/slowdowns).
  6. Communication — confirm engine control position; Bridge–ER comms.
  7. Record — complete form ECL-05; attach supporting evidence if any.

Acceptance Criteria

Readings within limits; interlocks functional; no critical alarms; documentation completed.

References: ISM 10 · Class Rules (Propulsion)
Change Log:
15 Sep 2025 — Version aligned with Class updates; added air system leak check.