BMM 4.1 — Bridge Preparation for Departure
Purpose
Ensure the bridge, equipment, and team are fully prepared for a safe and compliant departure.
Scope
All vessels, prior to departure from any port/anchorage.
Responsibilities
- Master — overall responsibility and final go/no-go decision.
- OOW — completes checks and logs readiness.
- Pilot/Mooring Team — integrates with bridge team brief.
Prerequisites
- Passage plan prepared and reviewed; UKC/tides/traffic considered.
- Bridge team brief held (roles, comms, contingencies).
- Applicable notices/permits completed (e.g., Hot Work stop, etc.).
Procedure
- Navigation Data — ECDIS/Charts updated; route checked; safety contours; no-go areas set.
- Equipment — Gyro(s), magnetic compass error, GPS, radars, AIS, VHF, echo sounder, BNWAS set.
- Alarms/Tests — Off-course, gyro repeaters, bridge wing controls; check hand-steering station.
- Comms — Check Bridge–Engine Room, internal, and external comms; pilot comms ready.
- Documents — Port clearance, pilot cards, tug orders, passage plan printout as needed.
- Record — Note completion in bridge log; attach any required checklists.
References: ISM 7 & 10 · SOLAS V · Company Standing Orders (Bridge)
Acceptance Criteria
All bridge systems operational; passage plan verified; team brief complete; records updated.
Change Log:
01 Oct 2025 — Initial controlled issue.